On our most recent project we lifted two cooling towers that was in two sections onto a roof of a building. Each unit had a max weight of 4,000 pounds. We used a 100 ton crane with jib to hoist them into place.
We received, unloaded and delivered the unites to the job site all in one day.
Here are some pictures.