Rhino Statute

 

This was a fun project for us. We received the rhino statue at our shop in four sections, three of the rhino and the base. 

We loaded onto our trucks and delivered to the job-site. This work was done in one night 

To complete the job, we procured a street closure permit, then used a knuckle boom with an operator to unload the sections and the base into place. We also supplied a forklift and gantry with riggers to set the sections on top of each other as shown in the picture.  

The project was completed in one night, but this was a temporary setup, so we attached the sections together with bolts and will have to return to dismantle it in a few months.